Guide

Factory & warehouse leasing guide

Everything you need to know before signing a lease

3-step process

01

Brief & direction

Clarify your industry, size, technical specs and location to shortlist the right industrial parks, factories and warehouses.

02

Site evaluation

Visit the factories and warehouses with you and check the technical and legal side before you choose.

03

Negotiation & signing

Negotiate rent, term and handover, review the lease and support the procedures until you start operating.

1Define your needs

Your industry, the factory / warehouse / office area, floor loading, clear height, power capacity, water and wastewater needs, loading docks, preferred area and target start date.

2Search and site visits

Shortlist industrial parks, ready-built factories or warehouses, then visit them to check the structure, floor, roof, fire-safety system, container truck access and the local labour pool.

3Compare options

Compare the total cost – rent, management / infrastructure fee, utilities, wastewater fee and fit-out cost – together with the handover date and the park's remaining land-lease term.

4Negotiation

Negotiate the rent, escalation, deposit, payment terms, rent-free period for installing machinery, landlord works to your specification, renewal and termination rights.

5Sign and complete procedures

Review the lease, then complete the required procedures such as investment registration (for foreign investors), enterprise registration and environmental filings. See also the Factory & warehouse legal tab.

6Install and operate

Carry out fit-out works, install machinery, complete fire-safety acceptance for any changes where required, connect utilities and start operations.

Things to check

  • Permitted industries: Each industrial park only accepts certain industries; check yours fits before going further.
  • Technical specs: Floor loading, clear height, column spacing, doors and loading docks directly affect how you can operate.
  • The park's land-lease term: Your lease cannot run beyond the land-use term remaining for the industrial park.

Common terms

  • RBF: Ready-Built Factory – a factory built in advance for lease.
  • RBW: Ready-Built Warehouse – a warehouse built in advance for lease.
  • BTS: Built-to-Suit – a factory or warehouse built to the tenant's own specification.
  • Management / infrastructure fee: A per-m² fee for using and maintaining the industrial park's shared infrastructure.

Frequently asked questions

What do foreign investors need to lease a factory?

Usually an Investment Registration Certificate (IRC) and an Enterprise Registration Certificate (ERC); the lease or a memorandum of understanding with the landlord is part of the application.

Ready-built factory or lease land and build?

A ready-built factory gets you running faster with less upfront capital; leasing land and building suits large, custom and long-term projects.

Should I use a leasing advisor?

An advisor helps you compare parks, negotiate terms and review the lease; SEE the SPACE advises tenants free of charge.

Need advice on the right factory or warehouse?

Contact us Call +84 768 999 647