Industrial Parks, Factories and Warehouses Along HCMC Ring Road 3: 2026 Update

Industrial parks, ready-built factories and warehouses along HCMC Ring Road 3 by section: Nhon Trach, Thu Duc – Tan Van, Cu Chi – Binh Chanh and Ben Luc, with indicative rents and route progress.

Industrial Parks, Factories and Warehouses Along HCMC Ring Road 3: 2026 Update

HCMC Ring Road 3 is more than 76 km long, with total investment above VND 75,300 billion, running through Ho Chi Minh City, Dong Nai and Tay Ninh. Once complete, it links the radial expressways (HCMC – Long Thanh – Dau Giay, Ben Luc – Long Thanh, HCMC – Trung Luong) and lets container trucks bypass the inner city. For manufacturers and logistics operators, it shortens trips to Cat Lai port, Cai Mep, Long Thanh Airport and the Mekong Delta. This guide lists industrial parks, ready-built factories and warehouses by route section, based on SEE the SPACE data.

Key takeaways

  • Progress: the Nhon Trach Bridge has been open since 08/2025; the eastern elevated section (Tan Van – HCMC – Long Thanh – Dau Giay interchange) is being finished; under the announced plan, most of the main line is due for completion in 2026.
  • Dong Nai (Nhon Trach): the densest industrial cluster, with ready-built factories at about $4.2 – $7.4/sqm/month.
  • Eastern HCMC: Hi-Tech Park, Tan Dong Hiep B and VSIP I – suited to high-tech, electronics and distribution.
  • Western HCMC and Tay Ninh: Tan Phu Trung, Vinh Loc 2 and Phu An Thanh – large land banks and good-value supply from about $3.6/sqm/month.

Route sections at a glance

SectionKey connectionsFeatured industrial parks
Dong Nai section: Nhon Trach – Phuoc AnBen Luc – Long Thanh Expwy, Nhon Trach BridgeNhơn Trạch III, Nhơn Trạch VI, Phước An, Ông Kèo
Eastern HCMC section: Thu Duc – Tan Van – Thuan AnHCMC – Long Thanh – Dau Giay Expwy, Tan Van interchangeTân Đông Hiệp B
Western HCMC section: Cu Chi – Hoc Mon – Binh ChanhNational Road 22, radial roads to the CBDTân Phú Trung, Tây Bắc Củ Chi, Vĩnh Lộc 3, Lê Minh Xuân
Tay Ninh section (former Long An): Ben Luc – My YenHCMC – Trung Luong and Ben Luc – Long Thanh ExpwysVĩnh Lộc 2, Phú An Thạnh, Thuận Đạo, Phúc Long, Nhựt Chánh

1. Dong Nai section: Nhon Trach – Phuoc An

The route starts at the Vinh Thanh interchange with the Ben Luc – Long Thanh Expressway, runs through Nhon Trach and crosses the Dong Nai River on the Nhon Trach Bridge (open since 08/2025) into HCMC. This is the densest industrial cluster on the route, with competitive factory rents.

Industrial parks

Industrial parkAreaIndicative land rent (USD/sqm/lease term)
Nhơn Trạch III IP674 ha$200
Nhơn Trạch VI IP314 hafrom $180
Phước An IP330 ha$200 – $202
Ông Kèo IP856 ha$151 – $201

Ready-built factories and warehouses

Factory / warehouseIndicative rent (USD/sqm/month)Clear heightFloor load
Factory – Nhơn Trạch (RBF.01)$5.4 – $7.49 m2.5 t/sqm
Factory – Nhơn Trạch 2 (RBF.01)$4.8 – $69 m3 t/sqm
Factory – Nhơn Trạch 2 (RBF.02)$5.88.7 m2 t/sqm
Factory – Nhơn Trạch 5$5.38.6 m2 t/sqm
Warehouse – Nhơn Trạch 6DContact10.5 m3 t/sqm
Factory – Nhơn Trạch 6 (400 – 10,000 m²)$4.87 m3 t/sqm
Factory – Nhơn Trạch 1 (RBF.14)$4.2 – $69 – 12 m1 – 3 t/sqm

2. Eastern HCMC section: Thu Duc – Tan Van – Thuan An

An elevated section of about 14.7 km runs from the HCMC – Long Thanh – Dau Giay Expressway interchange to Tan Van, past Vinhomes Grand Park and the Hi-Tech Park, then on to Di An and Thuan An (former Binh Duong). It suits technology and electronics firms and urban distribution warehouses.

Industrial parks

Industrial parkAreaIndicative land rent (USD/sqm/lease term)
Tân Đông Hiệp B IP163 ha$530 – $534

Ready-built factories and warehouses

Factory / warehouseIndicative rent (USD/sqm/month)Clear heightFloor load
Factory – Saigon Hi-Tech Park (SHTP)$6.77.5 m2 t/sqm
Warehouse – Tân Đông Hiệp B$6.89 – 11 m3 t/sqm
Warehouse – VSIP IContact––

3. Western HCMC section: Cu Chi – Hoc Mon – Binh Chanh

A 32 km-plus section through Cu Chi, Hoc Mon and Binh Chanh, crossing National Road 22 and several radial roads. It holds HCMC's largest industrial land bank, with easy links to the Moc Bai border gate and the Mekong Delta.

Industrial parks

Industrial parkAreaIndicative land rent (USD/sqm/lease term)
Tân Phú Trung IP590 ha$270 – $280
Tây Bắc Củ Chi IP381 haContact
Vĩnh Lộc 3 IP203 haContact
Lê Minh Xuân IP116 ha$350

Ready-built factories and warehouses

Factory / warehouseIndicative rent (USD/sqm/month)Clear heightFloor load
Factory – Đông Nam Củ Chi (RBF.12)$5.511.5 m3 t/sqm
Warehouse – Tân Phú TrungContact9 m3 t/sqm
Warehouse – Lê Minh Xuân 3 (7.3 ha)Contact––

4. Tay Ninh section (former Long An): Ben Luc – My Yen

A section of about 6.8 km ending at the My Yen interchange, linking the HCMC – Trung Luong and Ben Luc – Long Thanh expressways. It is the south-western gateway, with well-occupied industrial parks and good-value ready-built supply.

Industrial parks

Industrial parkAreaIndicative land rent (USD/sqm/lease term)
Vĩnh Lộc 2 IP561.5 ha$260 – $270
Phú An Thạnh IP352.8 ha$185 – $187
Thuận Đạo IP815 ha$260
Phúc Long IP78.9 haContact
Nhựt Chánh IP122.8 haContact

Ready-built factories and warehouses

Factory / warehouseIndicative rent (USD/sqm/month)Clear heightFloor load
Factory – Vĩnh Lộc 2A$4.8 – $5.29 m2.5 – 3 t/sqm
Factory – Vĩnh Lộc 2B$4.8 – $5.27 m1.5 – 2 t/sqm
Factory – Phú An Thạnh (RBF.01)$5.37 m2 t/sqm
Factory – Phú An Thạnh (RBF.05)$4.87.5 m2 t/sqm
Warehouse – Phú An Thạnh (3,000 – 12,000 m²)$3.610.5 m2 t/sqm
Warehouse – Thuận Đạo ExpansionContact––
Factory – Phúc Long$4.2412 m2 t/sqm

Rents are indicative figures from SEE the SPACE data, excluding service charge and VAT, and may change by size, term and timing. Ring Road 3 progress is compiled from official announcements and press reports up to 11/2026.

Why choose an industrial location on Ring Road 3

  • Trucks and containers bypass the city, reducing exposure to inner-city truck bans.
  • Fast links to Cat Lai port, the Cai Mep – Thi Vai port cluster and Long Thanh Airport via intersecting expressways.
  • Easy access to labour from HCMC and neighbouring provinces.
  • Factory rents in Nhon Trach and Ben Luc remain below former Binh Duong and Di An.

Leasing tips

Frequently asked questions

When will HCMC Ring Road 3 be completed?
Under the announced plan, the Nhon Trach Bridge opened in 08/2025, the eastern elevated section is being finished and most of the main line is due for completion in 2026. Section timelines may change.

Which area on Ring Road 3 offers the best factory rents?
Based on SEE the SPACE data, parks in Ben Luc (Tay Ninh) and Nhon Trach (Dong Nai) offer ready-built factories from about $3.6 – $5/sqm/month, below Di An and Thuan An.

Where should I look for a warehouse serving inner-city distribution?
Warehouses at Tan Dong Hiep B and VSIP I (eastern section) or Tan Phu Trung and Le Minh Xuan (western section) offer easier access to the city.

Contact SEE the SPACE

Looking for an industrial park, factory or warehouse along Ring Road 3? SEE the SPACE shares available space, arranges site visits and supports negotiation free of charge.

SEE the SPACE - Your Space, Expertly Guided

📞 Hotline: 0768 999 647
📧 Email: [email protected]
🌐 Website: seethespace.vn

Hot News