RBF.02 - Factory - Yen Phong II IP - Bac Ninh
Industrial Infrastructure
Industrial Amenities
-
Port Connectivity
⚓ Cai Lan Port: 45 km - Hai Phong Port: 110 km
-
Air Connectivity
✈️ Noi Bai Airport: 22 km
-
Others
📍 Hanoi CBD: 35 km - Vietnam – China border: 120 km
KTG Ready-Built Factory – Yen Phong II IP, Bac Ninh
Ready-built factories developed by KTG Industrial at Yen Phong II IP, Yen Phong Ward, Bac Ninh.
Specifications
- Unit size: 2,556 – 12,880 sqm
- Clear height: 7 – 9 m
- Floor loading: 2 tons/sqm
- Power: 100 W/sqm
Project scale
The project is part of the Yen Phong IP cluster (658 ha in total, about USD 10 billion of FDI). KTG Yen Phong II offers factories of 2,556 – 12,880 sqm, larger than Phase I, suited to companies that need large production lines or want to expand in Bac Ninh.
- 7 – 9 m clear height, 2 t/sqm floor loading, 100 W/sqm power, 0.3 – 1.4 m floor height.
- Close to a 51.6 ha urban area that houses workers and professionals.
- Suited to electronics, components, engineering and supply chains of large groups.
Connectivity
- VSIP Bac Ninh: 10 km
- Noi Bai Airport: 22 km
- Hanoi CBD: 35 km
- Cai Lan Port (Quang Ninh): 45 km
- Hai Phong Port / Cat Bi Airport: 110 km
- Vietnam – China border gate: 120 km
Contact SEE the SPACE for supply updates, help checking the right size and the handover schedule of new factory and warehouse projects.
SEE the SPACE - Your Space, Expertly Guided
📞 Hotline: +84 768 999 647
📧 Email: [email protected]
🌐 Website: seethespace.vn