Gilimex IP - Vĩnh Long
Location
Gilimex Industrial Park Vinh Long For Lease | 255ha Strategic Land
SEE the SPACE -Your Space, Expertly Guided.
Gilimex Industrial Park (IP) Vinh Long (also known as Binh Tan IP) is a key industrial infrastructure project in Vinh Long Province. With its large scale and strategic location adjacent to major expressways and seaports in the Mekong Delta, the project promises to be an ideal destination for enterprises in processing, consumer goods, and clean technology.
1. Project Overview
- Project Name: Gilimex Industrial Park Vinh Long (Phase 1 of Binh Tan IP).
- Developer: Gilimex Vinh Long Industrial Park Joint Stock Company.
- Location: Tan Quoi Town and Thanh Loi Commune, Binh Tan District, Vinh Long Province.
- Phase 1 Scale: 255 hectares (out of a total 400-hectare master plan).
- Operational Term: 50 years (2022 – 2072).
Development Orientation: A multi-sector industrial park prioritizing low-pollution industries such as agricultural and food processing, textiles, electronics, cosmetics, and warehousing services.
>>> Explore other Industrial Parks in Vinh Long

2. Geographical Location and Transport Connectivity
Gilimex IP Vinh Long is situated directly on National Highway 54, offering exceptionally convenient regional connectivity:
- Road:
- 5 km from the Ho Chi Minh City – Can Tho Expressway.
- 18 km from Can Tho City center.
- 30 km from Vinh Long City center.
- Air:
- 25 km from Can Tho International Airport.
- 155 km from Tan Son Nhat International Airport.
- Waterway:
- 21 km from Cai Cui Port.
- Internal amenities include an inland waterway port scale of 2.78 hectares.
3. Standard Infrastructure System
The technical infrastructure is synchronously planned to serve the continuous production needs of enterprises:
- Internal Traffic: Main axis 43m wide (20m roadway); branch roads 20m – 27m wide with spacious sidewalks.
- Power System: A 110kV/22kV transformer station with a capacity of 60MVA.
- Water Supply System: Utilizing water from the Binh Minh Water Plant with a capacity of 12,000 $m^3$/day-night, using a closed-loop HDPE piping network.
- Wastewater Treatment: A centralized treatment plant with a capacity of 7,600 $m^3$/day-night, ensuring wastewater meets standards before being discharged.
- Other Utilities: Firefighting systems along the roads (hydrants every 120m – 150m), modern telecommunications, and an independent rainwater drainage system.
4. Current Status and Investment Potential
- Progress: Currently in the process of land clearance compensation and infrastructure construction.
- Operational Timeline: Expected to commence operation and exploitation from 2025.
- Land Use Structure: Industrial land for lease accounts for nearly 70%, while green space ensuring an ecological environment accounts for over 10%.
Contact SEE the SPACE immediately for detailed dossiers and the latest rental price updates:
- Hotline: 0768 999 647
- Email: leasing@seethespace.vn
- Website: seethespace.vn
Your Space, Expertly Guided.