Quang Chu Cluster - Bac Kan - Thai Nguyen

Cho Moi Commune, Thai Nguyen
Minimum wage
Zone 3
Tax incentives
Free 4Y - 50% in the next 9Y
Construction density
70% - 3-5 floor

Location

Leasing information
Quang Chu Industrial Cluster, Bac Kan – A Strategic Investment Destination in Northeast Vietnam

Quang Chu Industrial Cluster, located in Cho Moi District, Bac Kan Province, is one of the province's key industrial infrastructure projects, playing a vital role in attracting investment and driving sustainable economic growth in the region. With well-organized planning, synchronized technical infrastructure, and a strategically connected location, Quang Chu Industrial Cluster offers compelling opportunities for both domestic and foreign investors.

1. Overview

Building & Construction Regulations

ItemDetail
LocationCho Moi Commune, Bac Kan – adjacent to Thai Nguyen
Size74.4 ha
Operating Period50 years (2020 – 2070)
Lease Rate & AvailabilityPlease contact SEE THE SPACE for the best support
  • Building Coverage Ratio: Up to 70%
  • Building Height: 3 – 5 floors
2. Location

Quang Chu Industrial Cluster sits in Cho Moi District — the gateway to Bac Kan Province — bordering Thai Nguyen Province and directly connected to the Hanoi–Thai Nguyen–Cho Moi Expressway. This location gives businesses a major advantage in reducing transport time and optimizing logistics costs.

Key transport connections:

  • Direct access to the Thai Nguyen – Cho Moi Expressway interchange
  • Bac Kan City: approximately 40 km
  • Hanoi: approximately 100–110 km, about 90 minutes by car
  • Located along National Highway 3, the main artery connecting Hanoi – Bac Kan – Cao Bang and border gates with China
  • Close proximity to Thanh Binh Industrial Park, creating a connected industrial cluster effect

Distance to major trade hubs:

  • Noi Bai International Airport: ~90 km (90 minutes by car)
  • Hai Phong International Seaport: ~210 km
  • Huu Nghi International Border Gate (Lang Son): ~175 km
3. Infrastructure

Quang Chu Industrial Cluster is equipped with fully synchronized technical infrastructure, meeting operational standards for industrial manufacturing facilities.

  • Site condition: Land has been leveled and prepared, ready for handover and factory construction.
  • Power supply: Stable, uninterrupted power from a 110/35kV substation approximately 10 km away; a 35kV medium-voltage grid runs along internal roads.
  • Water supply: Quang Chu Water Treatment Plant has a designed capacity of 25,000 m³/day, with Phase 1 delivering 2,000 m³/day.
  • Drainage system: Rainwater and wastewater are collected separately. Rainwater is channeled through the drainage network into existing canals, while wastewater is treated at the cluster's centralized treatment plant.
  • Wastewater and waste treatment: The wastewater treatment plant has a capacity of 1,400 m³/day using biological treatment technology. Wastewater undergoes preliminary treatment at each factory before connecting to the shared system. Solid waste is sorted at source; hazardous waste is managed, collected, and treated in compliance with legal regulations.
  • Telecommunications: International-standard telecom infrastructure ensures seamless domestic and international connectivity.
  • Internal roads & lighting: A well-designed internal road network provides easy access for vehicles, complemented by a synchronized lighting system along all routes.
  • Fire protection (PCCC): Firefighting water supply and hydrants are positioned along internal roads; an on-site fire protection unit is stationed within the cluster for rapid emergency response.
  • Greenery & environment: Extensive green zones and tree-lined walkways create a clean, green, and sustainable landscape throughout the cluster.
4. Investment Costs & Incentives

Investment Costs

ItemUnit Price
Land leaseVaries by plot size and location (excl. VAT; includes a one-time land lease payment through 31/12/2070)
Infrastructure management & maintenance feeVND 12,750/m²/year (~USD 0.5/m²/year), paid annually
Electricity pricePer Ministry of Industry and Trade regulations in effect at the time (Decision No. 2941/QĐ-BCT dated 08/11/2023)
Clean water pricePer Bac Kan Provincial People's Committee pricing at time of use
Wastewater treatment feeVND 11,475/m³ (~USD 0.45/m³), calculated as 80% of clean water consumption
Internet & other servicesPer service provider rates at time of use

Investment Incentives

Corporate Income Tax (CIT) — per Decree No. 218/2013/NĐ-CP:

  • Preferential tax rate of 10% for 15 years
  • 100% tax exemption for the first 4 years, followed by a 50% reduction for the next 9 years

Import Duty on Machinery & Equipment — per Decree No. 134/2016/NĐ-CP: Import duty exemption on goods used to create fixed assets for investment projects in incentivized areas.

Value-Added Tax (VAT) — per Circular No. 13/2023/TT-BTC: Businesses registered under the credit-invoice VAT method with a new investment project in the investment phase, and with accumulated unrecovered input VAT of VND 300 million or more, are eligible for a VAT refund.

Investment Procedure Support: Investors receive free guidance and assistance with pre- and post-licensing procedures, including:

  • Investment Registration Certificate
  • Business Registration Certificate
  • Tax registration
  • Environmental, fire safety (PCCC), and construction permit procedures
5. Target Industries & Workforce

Priority Industries for Investment

  • Wood and wood/bamboo product processing
  • Electronics, computer, and optical product manufacturing
  • Metal production
  • Food processing
  • Paper and paper product manufacturing
  • Chemical production and trading
6. Contact for Consultation

For up-to-date land availability, lease rates, and detailed investment consultation at Quang Chu Industrial Cluster, please contact SEE THE SPACE.

Get in touch for 100% FREE support.

📞 Hotline: 0768 999 647 📧 Email: leasing@seethespace.vn 🌐 Website: seethespace.vn

Read more
Industrial Image
cum-cong-nghiep-macland-1786725476.JPEG
chu-1680836523483410946342-1786725477.jpg
Nancy Luong
Nancy Luong
Managing Director
We are committed the follows:
1. Industrial land for lease & sale
2. Ready-built factories & warehouses for lease
3. Site surveys & masterplan analysis
4. Legal & investment procedure support
5. Full assistance from first inquiry to contract signing