Free Consulting Service for Industrial Land Lease & Sale | SEE THE SPACE – STS Industrial
1. Overview of Dong Van III Industrial Park
Taseco Dong Van III Industrial Park is planned as a multi-industry industrial zone with a large scale and synchronized infrastructure, making it an ideal destination for enterprises seeking sustainable development and high returns.
Dong Van III Industrial Park is located in Dong Van Ward, Ninh Binh, serving as the gateway connecting directly to Hanoi and forming part of the Dong Van industrial cluster (I – II – III – IV). The park prioritizes high-tech manufacturing, clean industries, mechanical engineering, and electronics.
Key milestones:
23/03/2017 – The Prime Minister approved Phase 1 investment with an area of 131.59 ha.
20/09/2019 – Phase 2 investment approved with 168.41 ha, total investment of VND 1,272 billion.
20/04/2022 – An additional 223 ha was added to the industrial park development planning of Ha Nam Province.
General Information:
Total area: ~523 ha
Occupancy rate: ~80% (select plots available)
Lease term: Until 2069
Developer: Taseco Real Estate Investment Corporation
Infrastructure: Fully completed and interconnected with nearby industrial zones
2. Strategic Location
2 km to Cau Gie – Ninh Binh Expressway access
5 km to National Highway 1A
40 km to Hanoi Center
70 km to Noi Bai International Airport
134 km to Lach Huyen Deep-water Port
90 km to Hai Phong Port
205 km to Huu Nghi Border Gate (Vietnam – China)
Dong Van III also benefits from seamless connectivity to other industrial parks within the Dong Van ecosystem and Ha Nam's logistics network.
3. Infrastructure & Facilities at Dong Van III Industrial Park
Internal Road System
Main roads: 36m – 42m wide
Branch roads & service roads: 25m – 35.5m wide
Power Supply
Two 110kV substations operating simultaneously:
110kV Dong Van
110kV Dong Van III
Water Supply
Industrial water capacity: 60,000 m³/day
Moc Bac Water Plant: 200,000 m³/day
Wastewater Treatment
Meets QCVN standards
Capacity: 7,750 m³/day
Telecommunications
High-speed telecommunications & international-standard internet
Fire Protection System
Fire hydrants, reservoir, and modern fire alarm system
Drainage System
Reinforced concrete round culverts, with stormwater collected and discharged into canals on the north, east, and west sides of the industrial park.
Hanoi University of Civil Engineering (Ha Nam Branch)
Worker accommodation areas are concentrated in Tiên Nội, Hoàng Đông, Đồng Văn Town, and Tiên Ngoại Ward.
4. Investment-attracted Industries
Dong Van III Industrial Park welcomes:
Electrical & electronic manufacturing
Mechanical engineering & fabrication
Component & spare parts production
FDI-supporting industries
Logistics & warehousing
Food processing & consumer goods production
Industries with high environmental pollution are not accepted.
5. Land Lease & Ready-built Factory Prices (Reference)
Land lease price:75 – 95 USD/m² (for the entire lease term)
Management fee:0.3 USD/m²/year
Ready-built factory:4.5 – 5.5 USD/m²/month
Payment method: Flexible — annually or one-time
👉 Direct quotation from the Developer — fast, accurate, transparent.
6. Advantages of Investing in Dong Van III
Prime position with excellent access across Northern Vietnam
Located within the well-developed Dong Van industrial cluster
Fully completed industrial infrastructure
Large labor supply at competitive cost
Attractive incentives for FDI projects
Strong logistics and manufacturing ecosystem
7. Free Industrial Land Consulting Service
SEE THE SPACE | STS Industrial provides end-to-end support:
✔ Tailored land/factory recommendations ✔ Direct negotiation with the Developer ✔ Legal & investment procedure assistance ✔ Site survey & planning analysis ✔ Full support until contract signing & project handover
100% Free – No hidden fees – No commitment required.